BIM ServicesTransport survey & design

Railway Bridge Construction BIM · CRFSDI

4D construction simulation of a double-deck six-track railway steel-truss cable-stayed bridge.

(81+162+432+162+81) m

Main bridge

920.4 m

Total length

≈ 800+ days

Construction period

Project overview

A double-deck six-track railway steel-truss cable-stayed bridge: the upper deck carries four passenger-dedicated tracks at 200 km/h, the lower deck two freight tracks at 120 km/h, reserving clearance for 5,000 t vessels and accidental-impact capacity. The river section has complex terrain and high installation precision.

BIM application & outcomes

Using Dassault 3DEXPERIENCE CATIA and DELMIA: the design institute completed the design and submitted the BIM model; the contractor performed detailing and 4D construction simulation and optimization of key methods.

The project parameterized all bridge components, building an enterprise library of characteristic bridge components, and used DELMIA to simulate steel-girder lifting and incremental launching.

Let's build

Let engineering get intelligent —starting with a conversation

Whether it's simulation analysis, BIM consulting or a digital-platform build, our engineering team is ready to help.

STSC

Shanghai T-Solutions Co., Ltd.

Address6F, Tower 1, Donghai Plaza, 28 Yuyuan East Rd, Jing'an, Shanghai
Support hotline021-62792913-180